MOQ
Public starting MOQ is usually 450 to 500 pcs, then category, material, trim, color count, and packaging change the real floor.
Materials
Material direction is confirmed against the brief before quoting, including outer fabric, lining, zipper, webbing, hardware, and recycled-material documentation when relevant.
Sample
A standard sample usually runs about 7 to 10 days when specifications are clear and materials are available, while premium or trim-heavy programs need more review time.
QC
The public QC route is inline inspection during production, final inspection before packing release, and packaging checks before shipment.
Packaging
Packaging is part of the manufacturing quote, from export cartons and folded packing to dust bags, hangtags, barcode labels, and retail sleeves.
Lead time
Bulk production commonly sits around 28 to 45 days by category after sample approval, with trim complexity and pack-out changing the window.